
Centurion Construction Group is completing a comprehensive renovation and fit-out of more than 26,000 square feet of existing warehouse space for Wolfgang Confectioners in Camp Hill, Pennsylvania. The project transforms the facility into a modern food production and packaging operation designed to support new chocolate manufacturing lines while enhancing efficiency, food safety, and long-term operational capacity.
The renovation includes connecting two existing warehouse buildings with new foundations, structural steel, and roofing to create a seamless production environment. Centurion is also installing food-grade resinous flooring, upgrading the HVAC and building automation systems, and constructing a new wastewater pump station and process water line that integrates with the facility’s existing treatment system.
Working in close collaboration with Wolfgang Confectioners, the design team, and specialty trade partners, Centurion is delivering a fully integrated manufacturing facility that supports the company’s continued growth while meeting the rigorous sanitation, durability, and performance standards required in the food manufacturing industry.