Geisinger Orthopedics – Renovation (Fit-Out)
Camp Hill, PA
13, 830 SF
Centurion Construction Group (CCG) was contracted by Geisinger Holy Spirit Hospital to complete an interior fit-out for a new orthopedics facility. The project involved transforming an existing space into a fully operational outpatient clinical environment designed to support a high volume of patients and specialized diagnostic imaging services.
Scope of Work:
- Two X-ray suites
- 19 exam rooms
- Six doctors’ offices
- Multiple support areas and nurses’ stations
- Complete fit-out of existing space, including saw cutting and excavation for new sanitary piping
- Electrical work to support imaging equipment
- Installation of six new rooftop HVAC units with associated ductwork and controls
- Construction of new exterior drive entrance and patient canopy