Geisinger Orthopedics – Renovation (Fit-Out)

Camp Hill, PA

13, 830 SF

Centurion Construction Group (CCG) was contracted by Geisinger Holy Spirit Hospital to complete an interior fit-out for a new orthopedics facility. The project involved transforming an existing space into a fully operational outpatient clinical environment designed to support a high volume of patients and specialized diagnostic imaging services.

Scope of Work:

  • Two X-ray suites
  • 19 exam rooms
  • Six doctors’ offices
  • Multiple support areas and nurses’ stations
  • Complete fit-out of existing space, including saw cutting and excavation for new sanitary piping
  • Electrical work to support imaging equipment
  • Installation of six new rooftop HVAC units with associated ductwork and controls
  • Construction of new exterior drive entrance and patient canopy