CURRENTLY UNDER CONSTRUCTION

Wolfgang Confectioners  – Tank Room Renovation

Camp Hill, PA

3,400 SF

Centurion Construction Group is partnering with Wolfgang Confectioners on a tank room renovation at their Camp Hill facility. This project involves modifications to the existing space to accommodate new tank equipment and support the facility’s operational needs. Improvements include selective demolition, masonry modifications, updated door openings, and mechanical and electrical upgrades. The renovation also includes a specialized heating and air circulation system designed to maintain the tank room’s required temperatures, creating a functional space tailored to Wolfgang Confectioners’ production needs.

Scope of Work:

  • Selective demolition of existing doors, bollards, and dock equipment.
  • Masonry modifications, including new and expanded door openings and infilling existing openings.
  • Concrete floor repairs and patching.
  • Installation of insulated metal wall panels.
  • Installation of three gas-fired heaters and a destratification fan to maintain required room temperatures.
  • HVAC modifications to accommodate new tank equipment.
  • Electrical upgrades
  • Interior and exterior painting and finish repairs to match existing conditions.