[ 2/2025 ] PROJECT COMPLETE – PSH Holy Spirit Hospital, Camp Hill PA

We are proud to announce the successful completion of a renovation project for PSH Holy Spirit Hospital in Camp Hill. This was an emergency equipment replacement for the hospital, so all work was completed under a very aggressive and restrictive schedule, often requiring night work and long shifts. Thanks to our dedicated team who are committed to following strict ICRA protocols, the hospital area surrounding our work zone remained fully operational during the construction process. An accomplishment for the team was overcoming the complexities of working in all the new MEP infrastructure within the existing MEPs both above the ceiling and below the floor.
The scope of work for the CT Scanner Suite included:
- Structural modifications for an opening to allow improved access for gurney-bound patients
- Converting an existing X-ray room to an equipment/support room for the new CT equipment
- Provide all new electrical and mechanical requirements for the new medical equipment and controls as well as new lighting and specialized diffusers
- Installing a new medical gas monitoring system
- Provide refresh of all new finishes including flooring, walls, ceilings, and countertops