After losing most of the liquid fertilizer and chemical capacity of their Gainesville, NY location in a fire during the Winter of 2019, Growmark FS engaged with Centurion to provide Design/Build Services for their replacement building.
The new building is an 8,500 SF fully insulated and conditioned pre-engineered metal building with new concrete foundations and slabs.
The newly constructed building is in the same location as the original building, providing GFS with a path back to normal operations. Construction on this project began in May 2020 and was completed in October 2020.