Elizabethtown College – Lab Renovations

The project will commence May of 2023 and will be completed in August of 2023. Centurion will bee renovating (3) chemistry labs and a corridor. We will remove and replace all casework, doors, flooring, and acoustical ceilings in these areas. Mechanicals, plumbing and light fixtures will be upgraded along with fresh paint on walls and door frames. New classroom accessories such as new marker boards, tacks boards, and pegboards will be installed. Lab ceilings will be changed from standard ceiling tiles and ceiling tile grid to open ceilings with hanging ceiling sound baffles and exposed flooring structure above giving it a modern industrial look and feel.