Penn State Health – Medical Arts Building Renovation

Penn State Health – Medical Arts Building Renovation

 

Penn State Health has teamed up with Centurion on the renovation of 1,900 square feet of medical office space.  The renovation includes servicing existing HVAC units, expanding doorways to accommodate hospital gurneys, and removal and replacement of outdated cabinetry and countertops.  Additionally, wallpaper will be removed and replaced with a fresh coat of paint while new luxury vinyl tile replaces worn out carpets in waiting rooms and hallways.

Geisinger 65 Forward – State College, PA

Geisinger 65 Forward – State College, PA

 

Geisinger State College 65 Forward is a renovation / fit-out to an existing 7,600 SF retail space. This renovation will include a new sanitary tie-in, storefront modifications, new MEP systems, and interior construction / finishes for Exam Rooms, a Multi-Purpose Gym, X-Ray Room, Nurse Station, Meds Room, and Offices. The project is scheduled to be under construction from April – August of 2021.

Holy Spirit Hospital – Gamma Knife Renovations and Install

Holy Spirit Hospital – Gamma Knife Renovations and Install

 

Centurion Construction was awarded the Gamma Knife Renovation and Installation Project at Holy Spirit’s Cancer Center in Mechanicsburg, PA.  Gamma Knife treatment is a form of radio surgery involving the use of concentrated beams of radiation to treat and eradicate cancer in the brain without ever having to make an incision.  Centurion Construction renovated the area in the back of the Holy Spirit Cancer Center and worked closely with the rigging team and the Elekta physicists to successfully install the new piece of equipment.

Geisinger / Holy Spirit – MH2, Operating Room Video Integration

Geisinger / Holy Spirit – MH2, Operating Room Video Integration

 

Centurion Construction was contracted by Geisinger / Holy Spirit to coordinate and complete an Operating Room Video Integration Project within multiple OR’s in Holy Spirit Hospital.  The project involved intense ICRA Requirements to protect the surrounding OR’s (which were in operation during construction).  It also involved modifications to the existing Med Gas, HVAC, Plumbing, Electrical and Structural Systems within each OR to provide a Video Integration System to allow the Surgeon’s to more safely and efficiency complete their surgical procedures.

Geisinger – Radiology Addition

Geisinger – Radiology Addition

 

Centurion has completed the construction of a new Interventional Radiology Wing at Geisinger’s Lewistown Hospital Location.  The project was complex and fast-paced with little room for storage or logistics.  It involved a 3,000 SF addition, work in Pre/Post Op Bays, Sterile Processing and the Boiler Room. Challenges of note for the project are:

  • Engineering and Construction of a Temporary Bridge to Access the Site
  • Deep Foundations within an existing Courtyard
  • Structural Steel with ability to expand to a 2nd Story
  • 11,000# AHU to serve the new Operating Room
  • New Reverse Osmosis Water System to serve Sterile Processing Expansion
  • New Utilities and Operating Equipment for Hybrid Operating Room

Gordner Prosthodontics – New Office Building Addition and Renovations

Gordner Prosthodontics – New Office Building Addition and Renovations

 

Dr. Wayne Gordner’s practice is focused on the practice of Dentistry known as Prosthodontics, which is the art and science of the restoration of natural teeth and/or the replacement of missing teeth or tissue with artificial substitutes.

Working closely with Dr. Gordner and his wife Cathy, Centurion developed a Renovation/Addition Scope of Work and design which ultimately converted an existing, neglected, residential property into a fully functioning, technically advanced dental practice.

Geisinger / Holy Spirit – Plaza 21 Dermatology Project

Geisinger / Holy Spirit – Plaza 21 Dermatology Project

 

Centurion was awarded another project with our trusted Partner, Geisinger / Holy Spirit at their Main Campus in Camp Hill, PA.  The Project involved the fit out of the 1st and 4th Floors of the Plaza 21 Building to house a Dermatology / MOHS Suite providing another element of care to the myriad of services available to the community at this Geisinger / Holy Spirit Site.  Construction began in December of 2017 and was completed in May of 2018.  Like most healthcare related renovation projects, there were numerous obstacles including but not limited to, working off hours in an operating daycare and installation of a 4″ Sprinkler Line/Vault.

Geisinger / Holy Spirit – Cath Lab Renovations

Geisinger / Holy Spirit – Cath Lab Renovations

 

When Geisinger / Holy Spirit made the decision to upgrade the equipment in one of their Cath Labs at Holy Spirit Hospital in Camp Hill, Centurion rose up to accept the challenge.  The project involved structural reinforcement, above ceiling structure for the monitor arm, new finishes, new ceiling and a myriad of Electrical Wiring / Cabling work to insure the new equipment operated as designed.

Geisinger – Linear Accelerator Replacement

Geisinger – Linear Accelerator Replacement

 

Centurion was selected by Geisinger System Services to complete the replacement of an existing Linear Accelerator at their Oakwood Cancer Center Location in Mechanicsburg, PA.

The project involved the demolition of the existing interior components in the Linear Accelerator Vault and upgrade of the HVAC, Plumbing and Electrical Systems to accept the new Linear Accelerator Equipment.  Finishes in the space were also upgraded to provide the patient with a more comfortable treatment experience.

Geisinger – Orthopedics Fitout

Geisinger – Orthopedics Fitout

 

Centurion Construction was contracted by Geisinger / Holy Spirit to perform the fit-out project for the new 13,500 SF Orthopedics facility containing two (2) x-ray suites, nineteen (19) exam rooms, six (6) doctor’s offices and multiple support areas / nurses’ stations.

The work involved a complete fit out of the existing space including saw cutting / excavation for new sanitary piping, major electrical work to facilitate the two (2) x-ray machines, six (6) new rooftop HVAC units and a new exterior drive entrance and canopy.