Growmark FS, LLC – Bridgeton Addition
On another project with Growmark FS, Centurion Construction provided Design/Build Services in the addition of approximately 5,500 SF of structure to address GFS’s changing needs at this location.
Existing dry fertilizer blending equipment, control systems and electrical gear were removed from the structure to allow work to start. Both additions house approximately 700T of additional dry fertilizer storage, an updated control room with state-of-the-art electrical and controls equipment, new fertilizer blending equipment, and the ability for future expansion in both square footage and controls/electrical system capacity. The project was completed in March 2020.