IWM approached Centurion with the need to renovate their existing plant for the purpose of moving existing / installing new manufacturing equipment.
Phase I of the project involved a new 1,250 square foot, two (2) bay loading dock addition with concrete ramp and associated walls. Interior renovations included the removal of a 2,700 square foot raised slab area, removal and modifications to the existing load-bearing wall, and replacement of 2,700 square foot slab on grade and demolition / modification to the roofing system.
In the existing building, Centurion removed and replaced a 2,400 square foot deteriorated concrete slab on grade and removed a 2,800 square foot wood truss and beam flooring system in the adjacent building, replaced with structural fill and concrete slab on grade.