Centurion has completed the construction of a new Interventional Radiology Wing at Geisinger’s Lewistown Hospital Location.  The project was complex and fast-paced with little room for storage or logistics.  It involved a 3,000 SF addition, work in Pre/Post Op Bays, Sterile Processing and the Boiler Room. Challenges of note for the project are:

  • Engineering and Construction of a Temporary Bridge to Access the Site
  • Deep Foundations within an existing Courtyard
  • Structural Steel with ability to expand to a 2nd Story
  • 11,000# AHU to serve the new Operating Room
  • New Reverse Osmosis Water System to serve Sterile Processing Expansion
  • New Utilities and Operating Equipment for Hybrid Operating Room